Published: August 19th, 2022,
Last updated: August 22nd, 2022
Five new coal-fired power plants with a total capacity of 6.7 million kilowatt hours are to be built in the southeastern Chinese province of Guangdong. Construction will begin as early as the end of September, and the power plants should then be connected to the grid by the end of 2024, reports the Chinese news portal Caixin. However, two of the power plants still have to be approved by the relevant authority at the provincial level.